Skip to content
hurghada.news

El Quseir desalination plant agreed, starting at 3,000 cubic metres a day

The Red Sea governor signed a protocol with a private contractor to build and run the plant on El Quseir's Corniche El-Ghaba in three stages, rising to 10,000 cubic metres a day.

27 November 2026

WhatsApp
Share
TelegramX
TelegramX

Red Sea Governor Walid El-Barki has signed a cooperation protocol with the company Dar Al-Miyah for Supplies and Contracting to build and operate a seawater desalination plant in El Quseir.

The plant is to be built on the Corniche El-Ghaba in El Quseir in three stages. The first stage is to produce 3,000 cubic metres of drinking water a day, and the completed plant up to 10,000. No construction start date, completion target or cost was given.

Under the protocol the company is to finance, build, operate and maintain the plant. El-Barki said wider use of desalination is part of the governorate's plan to raise drinking-water output as its towns and development projects grow.

El Quseirwater supplydesalinationinfrastructureRed Sea Governorate

Know someone heading to the Red Sea?

Forward this story — it might save them time, money, or a sunburn.

WhatsApp
Share
TelegramX
TelegramX

Sources

Based on Al-Osboa's report of the signing announced by the Red Sea Governorate. Ahram Gate and Al-Wafd reported the same signing. No construction timetable or cost has been published.

From the guide

More from News